Skip to content

Remodeling contractor

Remodeling in Fort Worth

Two very different building stocks in one city: pre-war bungalows on pier and beam near the south side, and slab-on-grade construction everywhere the city grew after the nineties.

Which one you own decides the job long before anyone picks a tile, so we start there. Every price we give you is fixed and in writing before demolition, and the permit dates sit in your schedule rather than arriving as a surprise in week two.

A residential street of early-twentieth-century craftsman bungalows with deep front porches, under mature trees in late afternoon light.

The age of the house decides the job before anyone opens a wall.

Near south side, platted 1883 to 1907

Historic district rules, in plain terms

  1. If your house sits inside a Fort Worth historic district, exterior work needs a Certificate of Appropriateness from the Historic and Cultural Landmarks Commission before it starts. Work that stays inside the existing walls does not touch that process at all.

  2. It matters the moment your plan reaches the outside. Adding or enlarging a window, cutting in an exterior vent, changing anything visible from the street: all of that goes to the commission.

  3. Plan around the calendar rather than the paperwork. Applications are due the third Monday of the month and the commission hears them the second Monday of the following one, so an exterior change realistically adds about a month before demolition can start. We build that into the schedule up front instead of discovering it in week two.

  4. Permits are separate and simpler. Moving plumbing or altering electrical needs one. Swapping fittings, retiling and painting inside the existing footprint does not. We pull whatever the work requires and the inspection dates go in your written schedule.

Every residential permit the city has issued since 2024 is mapped here, matched to the county appraisal roll.

Get your fixed price.

Three quick steps. Tell us the room and roughly what you have in mind, and the last step is the only place we ask for your number.

Step 1 of 3

Which room are we talking about?

The fear is not the price. It is being left mid-build.

These four commitments are in the contract rather than on a badge.

  • A fixed written price

    The number we sign is the number you pay. It moves only through a written change order you approve before any work starts.

  • A named project manager with a cell number

    One person owns your project from demolition to final walkthrough. You get their mobile number on day one, and they answer it.

  • A written update every Friday

    Photos, what happened this week, what happens next, and whether we are on schedule, in your inbox before the weekend either way.

  • Broom-clean every evening

    Floor protection down every morning, tools packed out and floors swept every night. You are living here while we work, and we work like it.